top of page

Unstable Back Patio Renovation

  • Writer: Hodgdon-Tyler Family Landscaping
    Hodgdon-Tyler Family Landscaping
  • Nov 7, 2022
  • 1 min read

ree

We had a client who found that his back patio was built over the top of his septic system and very unstable.


The client removed the patio and we came in and re-excavated and spread gravel to put a proper base underneath.



We rerouted the walkway to go around the septic tank and create a usable space in the backyard with walkways that made sense.


 
 

Hodgdon-Tyler

Family Landscaping

Call Us Today for a FREE ESTIMATE   207-299-6171

5 Crab Apple Ln, Hermon, ME

off of route to 1/2 mile past Dysart's Restaurant heading towards Hermon

Copyright© 2025 Hodgdon-Tyler Family Landscaping  All Rights Reserved.

site design/development petitetaway

Terms   |   Privacy   |   Accessibility

bottom of page